Here is a project that we recently started in Little Egg Harbor. This project took almost 1 1/2 years of planning due to the complexity of the project in which we were very involved to ensure the design was moving forward in the right direction. This home was required to have the entire lower level demolished. We then had to lift this home approximately 12 feet off the ground in order to begin the reconstruction of the foundation which consists of pilings cut down to grade, a concrete grade beam and large concrete pier foundation system. Once we set the house back down onto the foundation we can begin to rebuild the lower floor and have our client back in there home before the summer. We will update this site with progression pictures for this project.